What's includedOur methodOur workCost calculator

Tampa Bay design + remodeling

Stop gambling
with your remodel.

CFN is a design-first remodeling organization. We plan every detail, show you exactly what you are building, bring the trusted vetted licensed team to do the work, and stay through the final walkthrough to make sure it is executed right.

Design + Build team + Project management

Tampa · St. Pete · Clearwater

200+remodels completed
87K+social audience
LocalTampa Bay based
Included in every CFN design phase

Design is not an add-on

We make the decisions before they become expensive problems.

Most homeowners never hire a remodel designer. They start demolition, then scramble to make layout, material and construction decisions while the clock is running. CFN does the opposite. We build the complete design and construction roadmap first.

0112'-4"9'-0"72" DOUBLE VANITYSHOWER3'-6" × 5'-0"60" SOAKING TUBW.C.PRIMARY BATH≈ 111 SQ FT
01 · The blueprint

Floor plan

A professional, dimensioned layout with every fixture and critical clearance decided before demolition. The room should work on paper before anyone builds it in your house.

  • To-scale dimensions
  • Fixture placement
  • Contractor-ready layout
02
CFN MGMTMaterials List
Primary Bath
Wall tileZelligeSolène →
CountersQuartzVerano →
VanityWhite oakKestrel →
FixturesBronzeHalden →
SconcesBrassRhoon →
02 · Every selection

Material list

Every tile, counter, fixture, light and finish selected to work together, with exact products and purchase information organized in one place.

  • Clickable shopping links
  • Coordinated finishes
  • No allowance guessing
03Photorealistic CFN bathroom rendering
03 · See it first

Photorealistic rendering

See your actual layout, tile, finishes and lighting together before anything is ordered or a wall comes down. Love it, or change it, while changes are still easy.

  • Your real selections
  • True-to-life design
  • Revisions before construction
04
PRIMARY BATH · ELEVATION A
72"66" AFF
CONSTRUCTION NOTES PRIMARY BATH
  1. Wall sconces at 66" AFF
  2. Center tub filler on window
  3. 48" linear drain at rear wall
  4. Align niche to full tile course
04 · Build it correctly

Elevations + construction notes

The heights, alignments, clearances and placement details that stop your approved design from being reinterpreted by whoever happens to be holding the saw.

  • Critical elevations
  • Fixture and lighting heights
  • Tile, niche and drain details
05
CFN PROJECT SUPPORTDesigner + project manager
How high should the shower niche sit?
About 48". I'll mark it on the plan and confirm it with the installer.
Can you check it before they tile?
Already scheduled for tomorrow ✓
ON-SITE CHECKLayout verifiedMaterials confirmedInstall reviewedProblem solved
05 · With you during the build

Designer in your pocket + project management

When a contractor has a question, or something on site is not right, you are not left alone. CFN answers in real time, coordinates the team, checks the work and keeps the remodel aligned with the plan.

  • Direct text and video support
  • Contractor coordination
  • On-site oversight and problem solving
Full-service means full-service

Yes, we have the team to build it.

We do not hand you a design packet and wish you luck.

CFN brings together the vetted, licensed and insured professionals needed to complete your remodel, and manages the work as one connected project.

01

Use our remodeling team

We assemble the right licensed professionals for your scope, coordinate the trades and oversee the work from demolition through completion.

02

Already have someone you trust?

We can work with your contractor after reviewing their credentials, communication and completed work to confirm they can execute the CFN plan properly.

01 / The problem

The construction industry is broken

The industry tells you to find a contractor first. That is where the mess starts.

A contractor is hired, demolition starts and the homeowner suddenly becomes the designer, purchasing department, quality inspector and project manager. Major decisions get made under pressure while money is already being spent. That is not a remodeling system. It is chaos.

01

A layout that does not function

02

Missing items and surprise change orders

03

Design decisions made by whoever is standing on site

04

A finished home that misses the vision

CFN fixes the design, the team and the accountability problem.

02 / The method

The CFN design-first method

One connected process. No one pointing fingers.

We take your remodel from early idea to final walkthrough, with the major decisions made before demolition starts.

01

Design it

Resolve the layout, functionality, materials, fixtures and overall direction.

02

See it

Experience the finished space through realistic renderings before it becomes expensive to change.

03

Price it

Define the scope, review pricing and identify exactly what is, and is not, included.

04

Build it

We bring the vetted licensed professionals to do the work, coordinate every trade and protect the approved design through completion.

03 / Selected work

Designed first. Built with intention.

200+ local projects.

A selection of kitchens, bathrooms and whole-home transformations planned and managed by CFN across Tampa Bay.

Open kitchen · Tampa Bay
Open kitchen · Tampa Bay
Spa primary bath
Spa primary bath
Walnut island kitchen
Walnut island kitchen
Freestanding-tub bath
Freestanding-tub bath
Waterfall marble kitchen
Waterfall marble kitchen
Walk-in wet room
Walk-in wet room
Walnut kitchen
Walnut kitchen
Minimal spa bath
Minimal spa bath
Open-shelf kitchen
Open-shelf kitchen
Double-vanity bath
Double-vanity bath
Wet bar + primary suite
Wet bar + primary suite
Zellige-tile bath
Zellige-tile bath
Walk-in shower
Walk-in shower
Glass-enclosed spa bath
Glass-enclosed spa bath
Tampa shower remodel
Tampa shower remodel
04 / What we handle

One team. One plan.

You do not have to find or manage a separate remodeling team.

01Space planning + improved layouts
02Photorealistic renderings
03Every material + finish selection
04Product specifications + ordering
05Scope + contractor pricing review
06Our vetted licensed remodeling professionals
07On-site design oversight
08Final walkthrough + punch list
05 / Why CFN

Someone on your side

“Homeowners are being asked to spend tens or hundreds of thousands of dollars with less information than they would have buying a car.”

I created CFN to change that. We design the entire project, bring the trusted licensed professionals to complete it and stay involved through the final walkthrough, so design and construction operate as one team.

Christina NalbandFounder · Designer · Investor · Homeowner advocate
06 / The fit

Is CFN right for you?

We are not the right fit for every remodel. That is the point.

CFN is for you if

+You want the major decisions made before demolition
+You care about design and construction quality
+You want guidance on scope, selections and pricing
+You want one person protecting the complete vision

Probably not for you if

You are only looking for the lowest possible bid
You want to start building before completing the design
You want to make every decision as construction unfolds
You are only looking for decorating or furniture placement
07 / Start here

Limited Tampa Bay availability

One call starts the design and the build.

Your remodel is too expensive to design through allowances, text messages and last-minute decisions.

  • 15-minute project call
  • Discuss design, construction, timing and anticipated investment
  • Get a clear next step, without pressure

Choose a time first

Plan my remodel

08 / Questions

The things you should ask

Before anyone touches your home.

Do I need to find a separate remodeling team?+

No. CFN has trusted, vetted licensed and insured professionals who can complete the construction. We assemble the right team for your project, coordinate the work and remain involved from design through the final walkthrough.

Can CFN work with my contractor?+

Yes, when they are a strong fit. If you already have a contractor you trust, we will review their credentials, communication and completed work before deciding whether they can properly execute the CFN plan.

Why design before construction pricing?+

A meaningful price requires a meaningful scope. Until the layout, materials, fixtures and requirements are defined, a contractor is pricing assumptions, not your actual remodel.

What areas do you serve?+

CFN serves Tampa, St. Petersburg, Clearwater and select surrounding Tampa Bay communities.

What happens on the first call?+

We discuss the property, scope, desired timeline and anticipated investment. If CFN appears to be the right fit, we explain the design engagement and next step.

Book my free project call